UF MP-17 - Annual Campus Continuing Services for Minor Projects

Professional Consultants

Professionals selected will be eight (8) Architects, eight (8) MEP FP Engineers, six (6) Utilities Engineers (two will focus on municipal water resources engineering including wastewater process engineering, modeling, design, and construction of gravity and pressure piping and pumping systems; two will focus on high and medium voltage electrical distribution, including load modeling and substation design; and two will focus on district energy systems modeling and design), three (3) Environmental Engineers, three (3) Landscape Architects, three (3) Civil Engineers, two (2) Structural Engineers, two (2) Cx Engineers, and two (2) Surveyors. A Campus Service Minor Project is defined as a project that has a construction budget of less than $2,000,000.

Construction Managers

(10) continuing Campus Professional Services Construction Managers will be selected to provide professional construction management services for Campus Service Renovations and New Construction for Minor Projects on an ongoing basis. A Campus Service Minor Project is defined as a project that has a construction budget of less than $2,000,000.

Typical Projects

Typical projects assigned under this contract may include new construction, renovation, remodeling, reroofing and other building maintenance, equipment installation, pre-engineered metal buildings, greenhouses, pole barns, asbestos abatement, and fire code corrections. Areas requiring renovation or remodeling may include animal research or holding areas, research laboratories, classrooms, library and media centers, historic buildings, offices and related functions, outpatient clinics, reception and waiting areas, lobbies and corridors, atriums, courtyards and plazas, modular and pre-engineered buildings, apartments, dormitories, athletic facilities, and associated roadways, sitework, sidewalks, and landscaping. Projects could be located on the University of Florida main campus or at UF and IFAS facilities throughout the State of Florida. The maximum per-project construction cost is $2,000,000. Review the project fact sheets for additional information.

**PLEASE NOTE

The application deadline for the above reference submittals has been extended to Thursday, April 13, 2017, 3:00 PM. If you have already submitted your proposals today, we thank you for your submittals and there is no need to re-submit.

The correct address for the submittal is: ufmp17@ad.ufl.edu.

Submit a Project Request

Whether you need a new electrical outlet or a major capital project, our staff will evaluate your service request and determine how to best meet your needs.